This is where the silly table/shelf used to be. Note the angled wall.
Here is a closer look at the angled wall. Note the black on the frame. This was rot. The frame was hanging from the ceiling!
Look at the expert drainage. No wonder there was water!
Look at the junk left in the walls.......
and a bathroom cabinet.
Builder Mark said, "There's only one way to do this WerriB".
I could feel the dollars signs rising".
"Properly".
Dollar signals were confirmed.
With holidays in Paris put on further hold, we proceeded to "do it properly". The bedroom has gone from above to this:
Completely missing.
The neighbours love to tell me about the bobcat under the house. A retaining wall has been built. The floor has been dug out and dropped several centimetres. Drainage has been added all around. The room is much bigger. As I write today the room looks like this:
Here it is from the front.
There will be a sliding door to the front yard and a courtyard.
With the floor dropped the windows are higher.
As I write this the builders bang and drill. I can't hear the sea. However it's hot and I am contemplating a swim. Perhaps afternoon tea and a swim.




